Property snagging · Dubai

Know every defect before you take the keys.

Independent snagging inspections for new homes and rentals across Dubai. A qualified engineer checks your property room by room and gives you a clear photo report your developer or landlord can act on before you sign anything.

Apartments, townhouses & villas · All Dubai communities and developers

Snag report · 2BR apartmentExample layout
4shown
Hollow-sounding floor tilesLiving room · near balcony door
High
AC not reaching set temperatureBedroom 2 · fan coil unit
High
Gap in silicone at shower trayMaster bathroom
Medium
Paint patching visible on wallCorridor · beside entrance
Low
Every snag comes with a photo, exact location and a severity rating.
Licensed inspection engineers
Report in 24–48 hours
All developers & communities
Clear size-based pricing
What we do

One inspection at the moment it matters most.

Whether you're collecting keys from a developer or moving into a rental, the condition you accept on day one is the condition you're stuck with. We make sure it's on record.

Buyers · most booked

New-home handover snagging

A full inspection of your off-plan apartment, townhouse or villa before you sign the handover. You get a developer-ready snag list to get every defect fixed at their cost.

  • Before key collection
  • Re-inspection after fixes available
Handover snagging
Tenants & landlords

Move-in / move-out inspection

A dated, photo-by-photo record of a rental's condition. It protects tenants' security deposits and gives landlords an independent record of the property's condition.

  • Before you move in or hand back keys
  • Shared with both parties
Tenant inspections
Owners

End-of-warranty (DLP) inspection

Most developers fix defects for free during the defects liability period, usually 12 months after handover. We inspect before it expires so nothing slips through.

  • Book 1–2 months before expiry
  • Catches leaks, cracks & AC faults
Ask about DLP checks
Why snag at all?

Brand new doesn't mean finished.

Dubai's fast delivery timelines mean finishing work is often rushed. Most defects are invisible on a quick walkthrough with the agent, and much harder to get fixed once you've moved in.

01

Your leverage is highest before you sign

Before handover acceptance, developers are motivated to close out snags. Afterwards, your request joins a maintenance queue.

02

The costly problems are hidden

Hollow tiles, poor waterproofing, weak AC and wiring faults don't show up on a walkthrough. They show up months later as cracks, damp patches and summer breakdowns.

03

A clear report gets things fixed

A professional snag list with photos, locations and severity gives the developer's team exactly what they need to act, with no back and forth.

What we check

A checklist built for Dubai homes.

Heat, humidity, dust and district cooling create their own kinds of defects. Our checklist focuses on what actually fails in UAE properties.

AC & ventilation

  • Cooling performance per room
  • Thermostat & fan coil operation
  • Condensate drainage & leaks
  • Kitchen & bathroom extract fans

Electrical

  • Every socket: polarity & earth
  • RCD / earth-leakage trip test
  • Distribution board labelling
  • Lights, switches, balcony points

Plumbing & water

  • Water pressure & hot water
  • Leaks under sinks & vanities
  • Drainage flow & floor traps
  • Water heater installation

Waterproofing & wet areas

  • Shower falls toward drain
  • Grout & silicone continuity
  • Hidden moisture behind tiles
  • Balcony drainage & thresholds

Floors & tiling

  • Hollow tiles (tap test)
  • Lippage, levels & gaps
  • Cracked or chipped tiles
  • Skirting & transitions

Walls, ceilings & paint

  • Cracks & visible patching
  • Levels & straightness
  • Paint finish & coverage
  • Ceiling stains & access panels

Windows, doors & glazing

  • Seals against dust & water
  • Sliding door & lock operation
  • Scratched or damaged glass
  • Door alignment & hardware

Kitchen & appliances

  • Hob, oven, hood & dishwasher
  • Cabinet alignment & hinges
  • Worktop finish & joints
  • Sink, mixer & waste connections

Safety & balconies

  • Smoke detectors & fire points
  • Balcony railing height & fixings
  • Gas points where installed
  • Child-safety hazards
Tools on site: Thermal imaging camera Moisture meter Laser level Socket & RCD tester Infrared thermometer
How it works

Four steps, no paperwork headaches.

Tell us about the property

Send the community, size and handover date on WhatsApp or the form. You'll get a confirmed price straight away.

We book the slot

We coordinate access with your developer, agent or landlord, so you don't need to be there.

Engineer inspects

A qualified engineer inspects every room and system. Most apartments take 2–4 hours.

Report in 24–48h

You receive a photo report with locations and severity, ready to forward to the developer or landlord.

Pricing

See your price in ten seconds.

Priced by property type and size. No hidden fees, no "call for a quote".

Service
Property type
1,100 sq ft
Studio · 40010,000 sq ft
Your price
AED1,100
New-home handover snagging · apartment · 1,100 sq ft
  • Full room-by-room inspection
  • Photo report with severity ratings
  • Developer-ready snag list
  • Engineer available for questions
Book this on WhatsApp

Indicative price. We confirm the final price before booking; very large or unusual properties may vary.

Your report

A report developers can actually work from.

A vague list of "fix the paint" gets ignored. We give the developer's team a structured list they can assign straight to their contractors.

  • A photo for every snagClear, close-up photos so there's no argument about what or where.
  • Exact room & locationOrganised room by room, the way site teams walk the unit.
  • Severity ratingHigh, medium or low, so the important items get fixed first.
  • Shareable PDFForward it to the developer, landlord or property manager as is.
FAQ

Questions buyers and tenants ask us.

What is property snagging?

Snagging is a detailed inspection of a property to find defects, incomplete work and items that don't meet the agreed standard. The result is a snag list the developer, landlord or contractor can use to fix everything before you accept the property.

When should I book a snagging inspection in Dubai?

Book as soon as your developer issues the handover or inspection notice, and before you sign the handover acceptance. Once you sign, you have less leverage to get items fixed quickly.

Do DEWA and AC need to be connected?

Yes. Electricity, water and cooling (including district cooling where applicable) should be active so the engineer can test sockets, water pressure, drainage, water heaters and AC performance.

How much does snagging cost in Dubai?

Our pricing is based on property type and size. Use the instant price calculator for an indicative quote; we confirm the final price before booking.

Do I need to be there during the inspection?

No. Many clients are overseas. We coordinate access with the developer or agent and send you the full photo report. You're welcome to join if you'd like to see the property.

Can tenants book an inspection?

Yes. A move-in inspection records the condition of a rental before you move in, so you have dated photo evidence when it's time to get your security deposit back. More on tenant inspections.

Book an inspection

Handover coming up? Let's get it on the calendar.

Send us the details and we'll confirm your price and a slot within working hours. Prefer to chat? WhatsApp is the fastest way to reach us.